The 2-Minute Rule for factory acceptance testing
The specific requirements from the devices and the scope on the tests for being conducted need to be Obviously described during this organizing stage.Deal with the staff who'll in the long run be liable for operating the machines, those that “own the line.” Sending engineers isn’t enough; the operators will see what will make quite possibly t